The City of Ceuta is implementing various improvement works in local schools, taking advantage of the school holidays to studying in these centers.
The works are being carried out in schools "Juan Ayala", "Diego Martinez Rico," "The Torraos" and "Incident Aledo" - were recently visited by the local mayor, Juan Felipe Cano, and his council Works and Services Jesus Hernandez, who could see even how some of the tasks have been completed.
"The work of improving this infrastructure aims to improve the welfare and comfort of our students during their stay in the centers for school performance is the maximum," Cano said.
Thus, in the school "Juan Ayala" which has more than 25 years of antiquity among other tasks are rehabilitating the firm rubber children's play area and is proceeding to review anchorages themselves and their painting.
Other works are painted in public areas and the renovation of several toilets, with substitution of various children's toilets, renovation of pieces on health and porcelain slip paving.
"It has also installed interactive whiteboard with projector, touch control and Wi-Fi," Hernandez said.
great effort
"The" Diego Martínez Rico "is the center where most improvement efforts are being made," says the mayor of Works and Services, "because as the oldest school is the most attention and effort needed for their facilities are in the conditions we all want. "
At this time they are fixing the problems of indoor moisture that caused leaks in classrooms and corridors of the first floor, and are being renovated facilities of various toilets (paving, sanitary equipment, repairing walls, etc.) and of children's playground (firm and appliances).
It is also expanding the secretarial office inside the center WiFi network, painting the fence separating the general and infantile patios, and installing both a central PA - music as another whiteboard similar to the "Juan Ayala" .
His sports area is also getting a major makeover.
It is designed for the installation of a nylon mesh of 25x4 meters at its highest point, the replacement of fencing bottom of the indoor and placing a set of goals and baskets in the outdoor sports court.
In two other schools
They are also under improvement works at two other schools.
On the one hand, in the "Event Aledo" it is being completed the construction of a metal cover on one of the two existing sports courts, of 922 square meters.
Students at this center, recently built and with double line and Primary Education may well take shelter from the weather when playing sport.
In addition, school "The Torraos" is also rehabilitating both the floor of the children's play area and the various devices installed in it.
Source: Ayuntamiento de Ceutí